Tovuti hii inapatikana pia kwa Kiswahili. Soma kwa Kiswahili →Ce site est aussi disponible en français. Lire en français →Uru rubuga ruraboneka no mu Kinyarwanda. Soma mu Kinyarwanda →

LushBert Kenya

Calculate the value of your waste

For Kenyan schools, farms, hotels, markets and food factories: estimate how your organic waste could provide cooking gas, electricity and fertiliser. Neighbours in Tanzania, Uganda, Rwanda and beyond can select their country and currency.

Your waste, your value

What is your waste worth?

Choose your type of waste, enter how much you have per day and your local energy prices, and see the value in your own currency. Every type of waste gives a different amount of gas.

Simple payback–

Choose your country and enter your energy price, fertiliser value and disposal cost to see the payback.

–

Your values for your waste

– m³/daybiogas, theoretically*
– kg/dayLPG equivalent
– kWh/dayelectricity
– kWcontinuous electrical output

Choose a substrate (waste) and the daily amount for a quick first estimate of biogas, LPG equivalent and electricity. Add your local prices, fertiliser value and disposal cost to see the matching MiraX plant and its simple payback in your currency.

Fertiliser value: Digestate is a valuable fertiliser, so this value is never zero. Use your local price for comparable organic fertiliser. Disposal cost (gate fee): What you pay today to have the waste taken away. Enter 0 if you pay nothing.

Enter your local prices to see the value of your waste. LPG and electricity are alternative uses of the same biogas, so the two values are not added up. The plant is the next larger MiraX model for your daily amount (above 6 t per day: several MiraX 6000). The investment is the middle of the indicative price range of the MiraX table, converted from USD at monthly updated exchange rates (approx.); the final quotation comes from LushBert. Simple payback = investment divided by energy value, fertiliser value and saved disposal cost per year, without operating costs, financing or subsidies. Values per year are based on 8,600 operating hours. Typical reference values for a first orientation, from our substrate database for Africa, Asia and Latin America. Energy is calculated from the methane content of each substrate. For a project-specific calculation, ask Bert or contact us.

This is just a first glance of the value you have from your waste, but there are many other waste income streams.

Interested in your own project? Fill in the short RFQ template and send it to us. We will prepare a proposal for your site.

Terms explained
Biogas terms in plain words
m³ biogasThe amount of gas your plant produces, measured in cubic metres. 1 m³ (about 60 % methane) replaces about 0.45 kg of LPG.
LPG equivalentHow much bottled cooking gas (LPG) the biogas can replace.
kWhKilowatt-hour, the unit on your electricity bill. 1 m³ of biogas (about 60 % methane) gives about 1.8 kWh of electricity in a small CHP unit.
kW continuous outputThe electrical power the plant delivers around the clock, for example to run machines or cooling.
Methane (CH₄)The part of biogas that carries the energy, usually 50–65 %. More methane means more energy per m³.
oDM (organic dry matter)The part of the dry matter that bacteria can turn into gas.
DM (dry matter)The share of the waste that is not water. Drier waste usually gives more gas per tonne.
DigestateWhat remains after the gas is produced: a liquid and solid fertiliser.

Every substrate has a different gas yield

Approx. m³ biogas per tonne of fresh matter · DM = dry matter · right: ≈ kW electrical continuous output / kg LPG equivalent per day, each at 1 t/day. Click a substrate to use it in the calculator.

↓ Chart as image

* Biogas yields are typical literature values or estimates. Before any investment, a laboratory analysis of your actual substrate (DM/oDM and biogas fermentation test) is recommended and is required by the leasing bank.

1 tonne of substrate per day yields approx. 1 kW to 70 kW of continuous electrical power. Substrates and substrate mixtures are the key factor for energy output and payback period. Not all substrates can be mixed or used 100 % alone.

Indicative reference values for Africa, Asia and Latin America; actual values can differ by region. Actual yields vary with substrate quality, organic DM content and retention time. kW el. based on the methane content of each substrate, 9.97 kWh/m³ methane and 30 % CHP efficiency (small CHP units).

Biogas is a puzzle

Every biogas project is made of three kinds of pieces. Your waste decides how much gas you get: some substrates have a low gas yield, others a high one. The plant technology decides the investment: every part your project needs adds cost, every part it can do without saves money. The outputs you use decide your income. Only when the right pieces are put together does a plant pay back fast.

Inputyour waste

  • Food wastehigh gas yield
  • Kitchen wastehigh gas yield
  • Chicken manurehigh gas yield
  • Strawhigh gas yield
  • Napier grasshigh gas yield
  • Slaughterhouse wastemedium gas yield
  • Brewery wastemedium gas yield
  • Cow dungmedium gas yield
  • Pig slurrylow gas yield
  • Sewage sludgelow gas yield

Plant technologywhat your project needs

  • Pre-pit technology
  • Shredder
  • Pumps
  • Cavitation
  • Fermenter technology
  • Mira Carbon
  • Gas storage
  • Gas cleaning
  • Separator
  • Hygienisation
Bert biogas expertputs the pieces together

Outputwhat you earn and save

  • Biogas
  • LPG replacement (cooking gas)
  • Electricity (kWh)
  • Heat (kWh thermal)
  • Cooling
  • Bio-CNG
  • Liquid and solid fertiliser
  • Carbon credits
  • Saved disposal cost (gate fee)
  • CO₂ income

The right combination means a fast payback and a reliable plant. Which substrates, which technology, which outputs: putting these pieces together is the work of biogas experts. We do it with you, in a personal conversation about your site and your figures.

Interested in your own project?

Download the RFQ above or send an inquiry. Your email app opens with your calculator inputs and results. Please review and send the message.

Send to [email protected], with a copy to [email protected].

Questions about biogas? Ask Bert for LushBert Kenya.

Your leasing plan

Indicative calculation with your values from the calculator: investment –, income and savings per year –. Operating costs: 1 % of the investment per year. The plant starts with half of the income in month 1.

Choose your down payment
Cumulative surplus after leasing rate and operating costs.
The first 12 months (the full plan is in the Excel file)
MonthIncomeOperating costsLeasing rateSurplusCumulative

Indicative calculation – not an offer. Final terms by the leasing partner.